2017 Green Tariff Shared Renewables Solicitation

Latest News & Update

我们鼓励受访者定期查看此要约请求(RFO或征集)网站以获取更新, notices, and postings. SDG&E, 自行决定, 根据CPUC的命令, 可能会更改条款, requirements and schedule of this solicitation. 受访者应留意《手机买球网》网站上有关任何更新或更改的公告,包括已发布的问题 & answers. SDG&E will post all solicitation announcements, including scheduling changes or RFO amendments to this website. In particular, 与会者应查看《手机买球软件》网站,了解(i)投标前电话会议的详细信息和(ii)对提交问题的答案的发布.

  • 05/16/2017 - The FAQ document has been updated with questions and answers
  • 05/12/2017 - The RFO Schedule had been revised and the RFO has been extended, see our notice.
  • 05/01/2017 - The FAQ document has been updated with the last round of questions and answers
  • 04/24/2017 - The FAQ document has been updated with all questions received to date
  • 04/14/2017 - The FAQ document has been updated with the third set of questions and answers
  • 04/06/2017 - The FAQ document has been updated with the second set of questions and answers
  • 04/03/2017 -新版本的 投标人会议幻灯片 已被张贴
  • 2017年3月31日-投标人会议 slides and recording 现在可以买到
  • 03/29/2017 - The FAQ document has been created with the first set of questions and answers
  • 2017年3月22日-推出!

SDG&E’s 2017 RFO Seeking Green Tariff Shared Renewable Program Power Purchase Agreements

根据决定 (D.)16-05-006, D.15-01-051、分辨率 (R-)4734 (连同GTSR决定)由加州公用事业委员会(CPUC或委员会)发布, San Diego Gas & 电力公司(可持续发展目标&E)发布绿色关税共享可再生能源(GTSR)计划联合RFO,寻求与生产符合可再生能源组合标准(RPS)的能源的设施签订合同,以实施其增强社区可再生能源和绿色关税计划, 如下所述. 

GTSR决策授权可持续发展目标&E .实施GTSR计划,该计划包括两个组成部分:(1)绿色关税计划("EcoChoice”), 允许客户选择比可持续发展目标更高比例的可再生能源发电&E; and, (2) an Enhanced Community Renewables (“EcoShare”), allowing customers to participate in community-based projects. 

The programs are intended to:  1) make clean, renewable energy available to bundled utility customers, whether they own a home and/or can afford a significant capital investment; (2) increase the overall volume of renewable energy in the San Diego area; and (3) increase options for institutional, commercial and residential customers to meet their renewable energy goals.  Overall, SDG&E的GTSR计划旨在确保足够的合格容量,以满足高达59兆瓦的客户需求, 其中10兆瓦的总容量将预留给指定环境正义地区的项目.

SDG&E held one EcoChoice solicitation in 2015, 2017年的一次EcoShare拍卖, and will hold two EcoShare auctions in 2017 and 2018, 或直到所有可用的GTSR容量根据客户参与这些计划而保留.  为实现其生态共享目标,可持续发展目标&E将为其EcoShare或EcoChoice项目寻求高达20兆瓦的产能报价.  参与EcoShare计划的分布式能源供应商(DERP)可以聚集资源以满足CAISO 0.5 MW minimum size requirement to bid into the market.   由DERP资源组成的要约,只要满足EcoShare招标文件中概述的其他要求,就有资格参加本次招标.   This solicitation is not requesting bids for feed-in-tariff projects (e.g. Re-MAT, Bio-MAT), BioRAM, or other RAM or RPS procurement activities that currently exist or are being contemplated.

征集协议:

有关招标程序和资格要求的详细信息载于以下《手机买球软件》文件.

所需表格及文件:

  1. Offer Form - There is no limit on the number of Forms that can be submitted. Therefore, 鼓励受访者, 但不是必需的, to submit additional offers for our consideration with shorter tenors or with escalators.
  2. 互连协议或第二期互连研究(或同等分销水平)和/或快速通道文件 - Submit a copy of the most recent completed interconnection agreement, Phase II interconnection study or equivalent Fast Track documentation.  For Projects located in Imperial Valley and dynamically transferred via pseudo-tie into SDG&E的服务区域由CAISO, 提交已完成的第二期互连研究报告副本,并提供文件证明存在动态转让安排.
  3. 现场控制文件 - Submit copies of site control documents demonstrating: a) direct ownership; b) a lease; or c) an option to lease or purchase upon PPA approval (must be an exclusive option to the Bidder that will last until the completion of the RFO cycle).
  4. Site Maps -提交所有项目地图副本,显示位置、设施、布局、互连等. 项目单线图.
  5. Resource Report - please submit a verifiable fuel resource plan
  6. 全pv系统模型(仅限太阳能) -完整的PVSyst文件必须通过导出包含prj的整个项目来提交, met, inv, pan, etc. files.

参考表格及文件:

This solicitation employs a non-modifiable Power Purchase Agreement (PPA) structure.  这些文件已经过加州公用事业委员会(California Public Utilities Commission, CPUC)的预先批准,任何一个可持续发展目标都不得更改这些文件&E或中标人.  Only the blanks may be filled in with project specific information.  All respondents should submit bids per the terms of these agreements only.  

RFO回应说明:

A Respondent must submit their offer electronically via PowerAdvocate®, and attach all required forms and bid materials to the offer.  All offers must be uploaded to PowerAdvocate® no later than 12:00 p.m. (i.e. Noon), 太平洋标准时间, on May 5, 2017.  有意提交要约但尚未拥有现有帐户的要约人必须首先注册创建用户名/密码才能访问该活动. The PowerAdvocate® solicitation website can be accessed at:

http://www.poweradvocate.com/pR.do?okey=67434&pubEvent=true

RFO沟通

All questions or other communications regarding this RFO should be submitted via e-mail to (电子邮件保护) 获取EcoShare产品或 (电子邮件保护) EcoChoice产品.  无论哪种情况,你 MUST CC the Independent Evaluator, Harold Judd (电子邮件保护)

SDG&E将不接受任何其他形式的提问或意见,除非在投标人会议上.  在RFO附表规定的截止日期之后提交的问题将由SDG自行决定回答&E or the IE.  所有的问题和答案将在收到后以匿名方式在本网站公开发布.  We cannot respond directly to or confidentially to any questions.  我们鼓励回答者定期查看RFO网站的更新、通知和帖子.

投标人的会议

SDG&E will hold one bidder’s conference via web conference.  对于最终提交提案的人来说,参加电话会议并不是强制性的.

When: 3/29
Time:下午1:30 - 3:30 PPT
Audience link:   http://engage.vevent.com/rt/sandiegogasandelectriccompany~032217
免费电话:844-419-1768
会议ID: 87601373
投标前网络会议演示 

会议结束后,将尽快公布投标方会议的音频.  To access this, use the original event link.

2017年GTSR时间表

The following schedule and deadlines apply to this RFO.  SDG&E reserves the right to revise this schedule at any time and in SDG&E自行决定.  答复者有责任留意《手机买球软件》网站的最新时间表,以及对《手机买球软件》或招标程序可能作出的修订.  For a detailed schedule, please see the protocols for each product type.


NO.

ITEM

DATE

1.

已发布的RFO和可持续发展目标&E开始接受投标

March 22, 2017

2.

投标人的会议; 1:30 PM to 3:30 PM, PPT

March 29, 2017

3.

提交问题的截止日期

April 26, 2017

4.

Answers to all questions will be posted on SDG&E’s website

May 1, 2017

5.

DEADLINE TO SUBMIT RAM OFFERS/CLOSING DATE
Offers must be uploaded to PowerAdvocate® by no later than 12 P.M. (i.e. NOON) 太平洋标准时间

May 5, 2017

6.

NOTIFICATION TO WINNING AND CONTINGENT BIDDERS

June 1630, 2017

Participation from Diverse Business Enterprises

SDG&E encourages Diverse Business Enterprises (“DBEs”), “妇女拥有的企业”或“少数族裔拥有的企业”或“残疾退伍军人企业”定义在G.O. 156[1], to participate in this All Source RFO. 

此外,西班牙&E鼓励开发人员在项目开发和建设的各个阶段使用dbe. As a part of G.O. 156, SDG&E将要求开发人员确定并核实其DBE承包商/分包商的支出(如果有的话).

关于可持续发展目标的更多信息&E’s DBE program and utilizing DBEs can be found at:

http://www.sempra.com/about/supplier-diversity/

http://www.cpuc.ca.gov/puc/supplierdiversity/

SDG&E的DBE项目代表将在投标人的外展活动期间提供演示.  DBEs can request additional information by contacting SDG&E at (电子邮件保护).

常见问题

442.58 KB
PDF
2017 GTSR FAQs
2017 GTSR FAQs
77.05 KB
PDF
ECR I FAQs
ECR I FAQs
56.65 KB
PDF
RAM VI FAQs
RAM VI FAQs

支持文档

577.50 KB
DOC
EcoChoice Solicitation Protocol Document
EcoChoice Solicitation Protocol Document
598.50 KB
DOC
EcoShare Solicitation Protocol Document
EcoShare Solicitation Protocol Document
422.07 KB
XLSX
Offer Form
Offer Form
266.06 KB
DOCX
GTSR购电协议 (for EcoShare and EcoChoice projects);
GTSR购电协议 (for EcoShare and EcoChoice projects);
57.78 KB
DOCX
ECR Rider (for EcoShare projects without DERP), or
ECR Rider (for EcoShare projects without DERP), or
48.31 KB
DOCX
ECR DERP Rider (适用于有DERP的EcoShare项目)
ECR DERP Rider (适用于有DERP的EcoShare项目)
1.65 MB
PDF
投标前网络会议演示
投标前网络会议演示
331.20 KB
PDF
关于修订RFO时间表的公告
关于修订RFO时间表的公告