西班牙&E太阳能应用门户

219.11 KB
PDF
NEM Less than 30kW Interconnection Process (contractor install)
NEM Less than 30kW Interconnection Process (contractor install)
112.12 KB
PDF
NEM Less than 30kW Interconnection Process (self-install)
NEM Less than 30kW Interconnection Process (self-install)

Follow these steps to use the 西班牙&E申请系统:

  • If your company has previously been issued a company code by 西班牙&E, please select "I'm a Contractor and have a Company Code" on the registration page. (Using a provided company code will allow you immediate access to the status of applications already submitted to 西班牙&E).

  • If your company has not been issued a company code and you have not submitted a Net Energy Metering application previously, select "I'm a Contractor and don't have a Company Code" on the registration page.

  • 如果你是一个自安装者, please select "I'm Self Installing and don't have a Company Code" on the registration page.

  • Refer to the DIIS用户指南  to begin the application process.

For issues during this process you may contact us at 1-800-411-7343 or email our Net Energy Metering department at (电子邮件保护).

马上申请   (When enrolling, please select ‘DIIS’)

Net Energy Metering applications for interconnection must be filled out through our online form. Most residential customers will use this form.

Please submit your application two (2) weeks prior to city and/or county inspection being released. Submitting your application within this time-frame will minimize or avoid unexpected delays in the application approval process.

快速通道流程

Customers are eligible for the 快速通道流程 if the system size is less than 30kW, the application is submitted 5 business days prior to the city/county inspection, and there are no access issues on the property.  In order to apply for the 快速通道流程 the application must include a clear digital photo of the plaque and the electric meter (in the same frame).  These additional items will need to be uploaded along with the single line diagram.

The NEM application may take up to 15 minutes to complete. To prevent your session from timing out, please have all required documents on hand before starting the application process.

The following documents are needed to complete this form:

电al One-Line Diagram Drawing
电al One-Line Diagram Drawing
电al One-Line Diagram Drawing (CSI/PBI)
电al One-Line Diagram Drawing (CSI/PBI)

额外的文件

Multifamily 太阳能 Generation Credit Form 142-02768
Multifamily 太阳能 Generation Credit Form 142-02768
NEM-ST 30kW or Less Application Form 142-02774
NEM-ST 30kW or Less Application Form 142-02774
9.37 MB
PDF
DIIS用户指南
DIIS用户指南

更多的信息

Please call us at 1-800-411-7343 or email our Net Energy Metering department at (电子邮件保护).

Online applications are processed within 30 days of being received. However, the average processing time is less than five days (Monday to Friday, excluding holidays). You will receive a confirmation response via email upon processing. If you are planning a more complex or commercial project, your representative may ask for additional information.